You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
I am currently using a Raspberry 4 with the Raspbee II module to control around 40 ZigBee devices, primarily lamps and sockets, on an area of 10,000 square meters.
I want to migrate to an x86_64 / CC2652P based alternative and have already purchased and prepared the target environment.
Can I run both instances (on different channels) in parallel for the time of migration?
If I remove a device from the current setup (using Z2M Frontend), will it go into pairing mode automatically and connect to the target environment (where permit_join will be true)?
reacted with thumbs up emoji reacted with thumbs down emoji reacted with laugh emoji reacted with hooray emoji reacted with confused emoji reacted with heart emoji reacted with rocket emoji reacted with eyes emoji
-
Dear all,
I am currently using a Raspberry 4 with the Raspbee II module to control around 40 ZigBee devices, primarily lamps and sockets, on an area of 10,000 square meters.
I want to migrate to an x86_64 / CC2652P based alternative and have already purchased and prepared the target environment.
Can I run both instances (on different channels) in parallel for the time of migration?
If I remove a device from the current setup (using Z2M Frontend), will it go into pairing mode automatically and connect to the target environment (where permit_join will be true)?
Beta Was this translation helpful? Give feedback.
All reactions