Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

AGS: Math domain error for supercritical ORC plant #281

Open
softwareengineerprogrammer opened this issue Aug 27, 2024 · 0 comments
Open
Labels
bug Something isn't working

Comments

@softwareengineerprogrammer
Copy link
Collaborator

Reservoir Model, 1
Reservoir Depth, 5
Number of Segments, 1
Gradient 1, 112
Maximum Temperature, 600
Number of Production Wells, 2
Number of Injection Wells, 1
Production Well Diameter, 10.625
Injection Well Diameter, 10.625
Ramey Production Wellbore Model, True
Production Wellbore Temperature Drop, .5
Injection Wellbore Temperature Gain, 0
Production Flow Rate per Well, 60
Fracture Shape, 3
Fracture Height, 900
Reservoir Volume Option, 3
Reservoir Volume, 1000000000
Number of Fractures, 20
Water Loss Fraction, .02
Productivity Index, 5
Injectivity Index, 5
Injection Temperature, 50
Maximum Drawdown, 1
Reservoir Heat Capacity, 1000
Reservoir Density, 2700
Reservoir Thermal Conductivity, 2.7
End-Use Option, 1
Economic Model, 1
Power Plant Type, 2
Circulation Pump Efficiency, .8
Utilization Factor, .95
Surface Temperature, 20
Ambient Temperature, 20
Plant Lifetime, 20
Fixed Charge Rate, .05
Inflation Rate During Construction, 0
Starting Electricity Sale Price, 0.06
Ending Electricity Sale Price, 0.10
Electricity Escalation Start Year, 1
Electricity Escalation Rate Per Year, 0.012
Annual License Etc, 0
Flat License Etc, 0
Tax Relief Per Year, 2.212
Do Carbon Price Calculations, True
Time steps per year, 6
Discount Rate, 0.06
Reservoir Stimulation Capital Cost, 18
Well Drilling and Completion Capital Cost Adjustment Factor, 2
Injection Well Drilling and Completion Capital Cost Adjustment Factor, 2
Well Drilling and Completion Capital Cost, 23
Operation & Maintenance Cost of Surface Plant, 6.5
Units:Total Saved Carbon Production, kilotonne

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
bug Something isn't working
Projects
None yet
Development

No branches or pull requests

1 participant