You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Start PCM and import InfrastructureComponent_Example in workspace
PCM IDE up and running, PCM3.3_InfrastructureComponent_Example project available in workspace
2
In the InfrastructureComponent_Example project, right-click on "InfrastructureComponent Example-SimuLizar.launch" and select "Run As"->"1 InfrastructureComponent Example-Simulizar"
A simulation run is launched. The simulation should complete after a few minutes (or less).
3
Check the simulation results.Open the "PCM Results" perspective. In the experiments view, select "Memory Datasource"->"InfrastructureComponent Example"->"Experiment Runs"->"Run ..."Double click on result "Response Time of defaultUsageScenario". In the opening window, double-click on "XY Plot"
The response times should vary. The values should be between 0.141 (possibly not reached) and 0.741.
The text was updated successfully, but these errors were encountered:
The text was updated successfully, but these errors were encountered: