You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
(a feature request, at least I can't find this functionality mentioned in the manual)
Given
** TODO replace flux capacitor
SCHEDULED: <2024-09-11 Sat +1m>
:LOGBOOK:
- State "DONE" from "TODO" [2024-08-11 Sun 12:32]
:END:
on cycling TODO state (by swipe) into DONE it should turn straight back to TODO and push the SCHEDULED date one month forward and add a line to the logbook:
** TODO replace flux capacitor
SCHEDULED: <2024-10-22 +1m>
:LOGBOOK:
- State "DONE" from "TODO" [2024-09-22 Sat 10:17]
- State "DONE" from "TODO" [2024-08-11 Sun 12:32]
:END:
The text was updated successfully, but these errors were encountered:
(a feature request, at least I can't find this functionality mentioned in the manual)
Given
on cycling TODO state (by swipe) into DONE it should turn straight back to TODO and push the SCHEDULED date one month forward and add a line to the logbook:
The text was updated successfully, but these errors were encountered: