Skip to content

Latest commit

 

History

History
34 lines (26 loc) · 581 Bytes

02_05-parallel-jobs.md

File metadata and controls

34 lines (26 loc) · 581 Bytes

Configuring CI/CD pipelines

Continuous Integration

Parallel jobs

Try running this pipeline:

job_1:
  stage: build
  tags:
  - shell
  script: /bin/echo This is a mock build job

job_2a:
  tags:
  - shell
  script: /bin/echo I am job 2a
  
job_2b:
  tags:
  - shell
  script: /bin/echo I am job 2b

job_2c:
  tags:
  - shell
  script: /bin/echo I am job 2c 

Check the Pipeline detail view for this pipeline.

Notice that the "test" stage doesn't start until the "build" stage completes.

How are jobs visually represented as to what stage they belong to?