You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
We do not have any formal cost analyses but have run some scenario calculations (using calculator.aws). The cost varies based on number of chargers because scaling of containers is linear but a step growth with the growth of connected charge points. Just running the OCPP gateway (not the business logic triggered by OCPP actions), which includes Fargate, NLB, SQS, and IoT, is estimated to cost between $2 and $3 per charge point per year at scale. I would recommend connecting with your AWS SA to do a deeper dive on the economics of your specific use case.
Hi there,
Do you have an estimate of the AWS expenses associated with deploying this infrastructure?
Many thanks
The text was updated successfully, but these errors were encountered: