Skip to content

Latest commit

 

History

History
11 lines (7 loc) · 608 Bytes

risk_management.md

File metadata and controls

11 lines (7 loc) · 608 Bytes

Point 7 -- Risk Management

The following risks have been identified

Input data

  1. Failure to find enough experimental datasets with adequate metadata to fulfil the needs of the workflow. The SRA provides an excellent resource of experimental data which requires metadata submission as part of the data submission process. Also, the sue of simulation greatly reduces this risk.

  2. The datasets are too large to ingest or store within practicable limits of systems we have access to. Working with the REANNZ connected CatalystIT Ceph storage architecture will reduce this risk significantly.