Notifications
You must be signed in to change notification settings - Fork 2
/
Copy pathIEEE123Master.dss
223 lines (195 loc) · 16.4 KB
/
IEEE123Master.dss
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
! Annotated Master file for the IEEE 123-bus test case.
!
! This file is meant to be invoked from the Compile command in the "Run_IEEE123Bus.DSS" file.
!
! Note: DSS commands, property names, etc., are NOT case sensitive. Capitalize as you please.
! You should always do a "Clear" before making a new circuit:
Clear
Set DefaultBaseFrequency=60
! INSTANTIATE A NEW CIRCUIT AND DEFINE A STIFF 4160V SOURCE
! The new circuit is called "ieee123"
! This creates a Vsource object connected to "sourcebus". This is now the active circuit element, so
! you can simply continue to edit its property value.
! The basekV is redefined to 4.16 kV. The bus name is changed to "150" to match one of the buses in the test feeder.
! The source is set for 1.0 per unit and the Short circuit impedance is set to a small value (0.0001 ohms)
! The ~ is just shorthad for "more" for the New or Edit commands
New object=circuit.ieee123
~ basekv=4.16 Bus1=150 pu=1.00 R1=0 X1=0.0001 R0=0 X0=0.0001
! 3-PHASE GANGED REGULATOR AT HEAD OF FEEDER (KERSTING ASSUMES NO IMPEDANCE IN THE REGULATOR)
! the first line defines the 3-phase transformer to be controlled by the regulator control.
! The 2nd line defines the properties of the regulator control according to the test case
new transformer.reg1a phases=3 windings=2 buses=[150 150r] conns=[wye wye] kvs=[4.16 4.16] kvas=[5000 5000] XHL=.001 %LoadLoss=0.00001 ppm=0.0
new regcontrol.creg1a transformer=reg1a winding=2 vreg=120 band=2 ptratio=20 ctprim=700 R=3 X=7.5
! REDIRECT INPUT STREAM TO FILE CONTAINING DEFINITIONS OF LINECODES
! This file defines the line impedances is a similar manner to the description in the test case.
Redirect IEEELineCodes.DSS
! LINE DEFINITIONS
! Lines are defined by referring to a "linecode" that contains the impedances per unit length
! So the only properties required are the LineCode name and Length. Units are assumed to match the definition
! since no units property is defined in either the Linecodes file or this file.
! Note that it is not necessary to explicitly specify the node connections for the 3-phase lines
! unless they are not ".1.2.3". However, they are spelled out here for clarity.
! The DSS assumes .1.2.3.0.0 ... for connections of 3 or more phases.
! Likewise, .1 is not necessary for 1-phase lines connected to phase 1. However, if it is connected
! to any other phase, it must be specified. For completeness, everything is spelled out here.
!
! Note that it is recommended that the "units=" property be used here and in the Linecode definition as well
! to avoid confusion in the future
! *** Original *** New Line.L115 Phases=3 Bus1=149.1.2.3 Bus2=1.1.2.3 LineCode=1 Length=0.4
! Since the default is 3-phase, the definition of this line can be simpler:
New Line.L115 Bus1=149 Bus2=1 LineCode=1 Length=0.4 units=kft
New Line.L1 Phases=1 Bus1=1.2 Bus2=2.2 LineCode=10 Length=0.175 units=kft
New Line.L2 Phases=1 Bus1=1.3 Bus2=3.3 LineCode=11 Length=0.25 units=kft
New Line.L3 Phases=3 Bus1=1.1.2.3 Bus2=7.1.2.3 LineCode=1 Length=0.3 units=kft
New Line.L4 Phases=1 Bus1=3.3 Bus2=4.3 LineCode=11 Length=0.2 units=kft
New Line.L5 Phases=1 Bus1=3.3 Bus2=5.3 LineCode=11 Length=0.325 units=kft
New Line.L6 Phases=1 Bus1=5.3 Bus2=6.3 LineCode=11 Length=0.25 units=kft
New Line.L7 Phases=3 Bus1=7.1.2.3 Bus2=8.1.2.3 LineCode=1 Length=0.2 units=kft
New Line.L8 Phases=1 Bus1=8.2 Bus2=12.2 LineCode=10 Length=0.225 units=kft
New Line.L9 Phases=1 Bus1=8.1 Bus2=9.1 LineCode=9 Length=0.225 units=kft
New Line.L10 Phases=3 Bus1=8.1.2.3 Bus2=13.1.2.3 LineCode=1 Length=0.3 units=kft
New Line.L11 Phases=1 Bus1=9r.1 Bus2=14.1 LineCode=9 Length=0.425 units=kft
New Line.L12 Phases=1 Bus1=13.3 Bus2=34.3 LineCode=11 Length=0.15 units=kft
New Line.L13 Phases=3 Bus1=13.1.2.3 Bus2=18.1.2.3 LineCode=2 Length=0.825 units=kft
New Line.L14 Phases=1 Bus1=14.1 Bus2=11.1 LineCode=9 Length=0.25 units=kft
New Line.L15 Phases=1 Bus1=14.1 Bus2=10.1 LineCode=9 Length=0.25 units=kft
New Line.L16 Phases=1 Bus1=15.3 Bus2=16.3 LineCode=11 Length=0.375 units=kft
New Line.L17 Phases=1 Bus1=15.3 Bus2=17.3 LineCode=11 Length=0.35 units=kft
New Line.L18 Phases=1 Bus1=18.1 Bus2=19.1 LineCode=9 Length=0.25 units=kft
New Line.L19 Phases=3 Bus1=18.1.2.3 Bus2=21.1.2.3 LineCode=2 Length=0.3 units=kft
New Line.L20 Phases=1 Bus1=19.1 Bus2=20.1 LineCode=9 Length=0.325 units=kft
New Line.L21 Phases=1 Bus1=21.2 Bus2=22.2 LineCode=10 Length=0.525 units=kft
New Line.L22 Phases=3 Bus1=21.1.2.3 Bus2=23.1.2.3 LineCode=2 Length=0.25 units=kft
New Line.L23 Phases=1 Bus1=23.3 Bus2=24.3 LineCode=11 Length=0.55 units=kft
New Line.L24 Phases=3 Bus1=23.1.2.3 Bus2=25.1.2.3 LineCode=2 Length=0.275 units=kft
New Line.L25 Phases=2 Bus1=25r.1.3 Bus2=26.1.3 LineCode=7 Length=0.35 units=kft
New Line.L26 Phases=3 Bus1=25.1.2.3 Bus2=28.1.2.3 LineCode=2 Length=0.2 units=kft
New Line.L27 Phases=2 Bus1=26.1.3 Bus2=27.1.3 LineCode=7 Length=0.275 units=kft
New Line.L28 Phases=1 Bus1=26.3 Bus2=31.3 LineCode=11 Length=0.225 units=kft
New Line.L29 Phases=1 Bus1=27.1 Bus2=33.1 LineCode=9 Length=0.5 units=kft
New Line.L30 Phases=3 Bus1=28.1.2.3 Bus2=29.1.2.3 LineCode=2 Length=0.3 units=kft
New Line.L31 Phases=3 Bus1=29.1.2.3 Bus2=30.1.2.3 LineCode=2 Length=0.35 units=kft
New Line.L32 Phases=3 Bus1=30.1.2.3 Bus2=250.1.2.3 LineCode=2 Length=0.2 units=kft
New Line.L33 Phases=1 Bus1=31.3 Bus2=32.3 LineCode=11 Length=0.3 units=kft
New Line.L34 Phases=1 Bus1=34.3 Bus2=15.3 LineCode=11 Length=0.1 units=kft
New Line.L35 Phases=2 Bus1=35.1.2 Bus2=36.1.2 LineCode=8 Length=0.65 units=kft
New Line.L36 Phases=3 Bus1=35.1.2.3 Bus2=40.1.2.3 LineCode=1 Length=0.25 units=kft
New Line.L37 Phases=1 Bus1=36.1 Bus2=37.1 LineCode=9 Length=0.3 units=kft
New Line.L38 Phases=1 Bus1=36.2 Bus2=38.2 LineCode=10 Length=0.25 units=kft
New Line.L39 Phases=1 Bus1=38.2 Bus2=39.2 LineCode=10 Length=0.325 units=kft
New Line.L40 Phases=1 Bus1=40.3 Bus2=41.3 LineCode=11 Length=0.325 units=kft
New Line.L41 Phases=3 Bus1=40.1.2.3 Bus2=42.1.2.3 LineCode=1 Length=0.25 units=kft
New Line.L42 Phases=1 Bus1=42.2 Bus2=43.2 LineCode=10 Length=0.5 units=kft
New Line.L43 Phases=3 Bus1=42.1.2.3 Bus2=44.1.2.3 LineCode=1 Length=0.2 units=kft
New Line.L44 Phases=1 Bus1=44.1 Bus2=45.1 LineCode=9 Length=0.2 units=kft
New Line.L45 Phases=3 Bus1=44.1.2.3 Bus2=47.1.2.3 LineCode=1 Length=0.25 units=kft
New Line.L46 Phases=1 Bus1=45.1 Bus2=46.1 LineCode=9 Length=0.3 units=kft
New Line.L47 Phases=3 Bus1=47.1.2.3 Bus2=48.1.2.3 LineCode=4 Length=0.15 units=kft
New Line.L48 Phases=3 Bus1=47.1.2.3 Bus2=49.1.2.3 LineCode=4 Length=0.25 units=kft
New Line.L49 Phases=3 Bus1=49.1.2.3 Bus2=50.1.2.3 LineCode=4 Length=0.25 units=kft
New Line.L50 Phases=3 Bus1=50.1.2.3 Bus2=51.1.2.3 LineCode=4 Length=0.25 units=kft
New Line.L51 Phases=3 Bus1=51.1.2.3 Bus2=151.1.2.3 LineCode=4 Length=0.5 units=kft
New Line.L52 Phases=3 Bus1=52.1.2.3 Bus2=53.1.2.3 LineCode=1 Length=0.2 units=kft
New Line.L53 Phases=3 Bus1=53.1.2.3 Bus2=54.1.2.3 LineCode=1 Length=0.125 units=kft
New Line.L54 Phases=3 Bus1=54.1.2.3 Bus2=55.1.2.3 LineCode=1 Length=0.275 units=kft
New Line.L55 Phases=3 Bus1=54.1.2.3 Bus2=57.1.2.3 LineCode=3 Length=0.35 units=kft
New Line.L56 Phases=3 Bus1=55.1.2.3 Bus2=56.1.2.3 LineCode=1 Length=0.275 units=kft
New Line.L57 Phases=1 Bus1=57.2 Bus2=58.2 LineCode=10 Length=0.25 units=kft
New Line.L58 Phases=3 Bus1=57.1.2.3 Bus2=60.1.2.3 LineCode=3 Length=0.75 units=kft
New Line.L59 Phases=1 Bus1=58.2 Bus2=59.2 LineCode=10 Length=0.25 units=kft
New Line.L60 Phases=3 Bus1=60.1.2.3 Bus2=61.1.2.3 LineCode=5 Length=0.55 units=kft
New Line.L61 Phases=3 Bus1=60.1.2.3 Bus2=62.1.2.3 LineCode=12 Length=0.25 units=kft
New Line.L62 Phases=3 Bus1=62.1.2.3 Bus2=63.1.2.3 LineCode=12 Length=0.175 units=kft
New Line.L63 Phases=3 Bus1=63.1.2.3 Bus2=64.1.2.3 LineCode=12 Length=0.35 units=kft
New Line.L64 Phases=3 Bus1=64.1.2.3 Bus2=65.1.2.3 LineCode=12 Length=0.425 units=kft
New Line.L65 Phases=3 Bus1=65.1.2.3 Bus2=66.1.2.3 LineCode=12 Length=0.325 units=kft
New Line.L66 Phases=1 Bus1=67.1 Bus2=68.1 LineCode=9 Length=0.2 units=kft
New Line.L67 Phases=3 Bus1=67.1.2.3 Bus2=72.1.2.3 LineCode=3 Length=0.275 units=kft
New Line.L68 Phases=3 Bus1=67.1.2.3 Bus2=97.1.2.3 LineCode=3 Length=0.25 units=kft
New Line.L69 Phases=1 Bus1=68.1 Bus2=69.1 LineCode=9 Length=0.275 units=kft
New Line.L70 Phases=1 Bus1=69.1 Bus2=70.1 LineCode=9 Length=0.325 units=kft
New Line.L71 Phases=1 Bus1=70.1 Bus2=71.1 LineCode=9 Length=0.275 units=kft
New Line.L72 Phases=1 Bus1=72.3 Bus2=73.3 LineCode=11 Length=0.275 units=kft
New Line.L73 Phases=3 Bus1=72.1.2.3 Bus2=76.1.2.3 LineCode=3 Length=0.2 units=kft
New Line.L74 Phases=1 Bus1=73.3 Bus2=74.3 LineCode=11 Length=0.35 units=kft
New Line.L75 Phases=1 Bus1=74.3 Bus2=75.3 LineCode=11 Length=0.4 units=kft
New Line.L76 Phases=3 Bus1=76.1.2.3 Bus2=77.1.2.3 LineCode=6 Length=0.4 units=kft
New Line.L77 Phases=3 Bus1=76.1.2.3 Bus2=86.1.2.3 LineCode=3 Length=0.7 units=kft
New Line.L78 Phases=3 Bus1=77.1.2.3 Bus2=78.1.2.3 LineCode=6 Length=0.1 units=kft
New Line.L79 Phases=3 Bus1=78.1.2.3 Bus2=79.1.2.3 LineCode=6 Length=0.225 units=kft
New Line.L80 Phases=3 Bus1=78.1.2.3 Bus2=80.1.2.3 LineCode=6 Length=0.475 units=kft
New Line.L81 Phases=3 Bus1=80.1.2.3 Bus2=81.1.2.3 LineCode=6 Length=0.175 units=kft
New Line.L82 Phases=3 Bus1=81.1.2.3 Bus2=82.1.2.3 LineCode=6 Length=0.25 units=kft
New Line.L83 Phases=1 Bus1=81.3 Bus2=84.3 LineCode=11 Length=0.675 units=kft
New Line.L84 Phases=3 Bus1=82.1.2.3 Bus2=83.1.2.3 LineCode=6 Length=0.25 units=kft
New Line.L85 Phases=1 Bus1=84.3 Bus2=85.3 LineCode=11 Length=0.475 units=kft
New Line.L86 Phases=3 Bus1=86.1.2.3 Bus2=87.1.2.3 LineCode=6 Length=0.45 units=kft
New Line.L87 Phases=1 Bus1=87.1 Bus2=88.1 LineCode=9 Length=0.175 units=kft
New Line.L88 Phases=3 Bus1=87.1.2.3 Bus2=89.1.2.3 LineCode=6 Length=0.275 units=kft
New Line.L89 Phases=1 Bus1=89.2 Bus2=90.2 LineCode=10 Length=0.25 units=kft
New Line.L90 Phases=3 Bus1=89.1.2.3 Bus2=91.1.2.3 LineCode=6 Length=0.225 units=kft
New Line.L91 Phases=1 Bus1=91.3 Bus2=92.3 LineCode=11 Length=0.3 units=kft
New Line.L92 Phases=3 Bus1=91.1.2.3 Bus2=93.1.2.3 LineCode=6 Length=0.225 units=kft
New Line.L93 Phases=1 Bus1=93.1 Bus2=94.1 LineCode=9 Length=0.275 units=kft
New Line.L94 Phases=3 Bus1=93.1.2.3 Bus2=95.1.2.3 LineCode=6 Length=0.3 units=kft
New Line.L95 Phases=1 Bus1=95.2 Bus2=96.2 LineCode=10 Length=0.2 units=kft
New Line.L96 Phases=3 Bus1=97.1.2.3 Bus2=98.1.2.3 LineCode=3 Length=0.275 units=kft
New Line.L97 Phases=3 Bus1=98.1.2.3 Bus2=99.1.2.3 LineCode=3 Length=0.55 units=kft
New Line.L98 Phases=3 Bus1=99.1.2.3 Bus2=100.1.2.3 LineCode=3 Length=0.3 units=kft
New Line.L99 Phases=3 Bus1=100.1.2.3 Bus2=450.1.2.3 LineCode=3 Length=0.8 units=kft
New Line.L118 Phases=3 Bus1=197.1.2.3 Bus2=101.1.2.3 LineCode=3 Length=0.25 units=kft
New Line.L100 Phases=1 Bus1=101.3 Bus2=102.3 LineCode=11 Length=0.225 units=kft
New Line.L101 Phases=3 Bus1=101.1.2.3 Bus2=105.1.2.3 LineCode=3 Length=0.275 units=kft
New Line.L102 Phases=1 Bus1=102.3 Bus2=103.3 LineCode=11 Length=0.325 units=kft
New Line.L103 Phases=1 Bus1=103.3 Bus2=104.3 LineCode=11 Length=0.7 units=kft
New Line.L104 Phases=1 Bus1=105.2 Bus2=106.2 LineCode=10 Length=0.225 units=kft
New Line.L105 Phases=3 Bus1=105.1.2.3 Bus2=108.1.2.3 LineCode=3 Length=0.325 units=kft
New Line.L106 Phases=1 Bus1=106.2 Bus2=107.2 LineCode=10 Length=0.575 units=kft
New Line.L107 Phases=1 Bus1=108.1 Bus2=109.1 LineCode=9 Length=0.45 units=kft
New Line.L108 Phases=3 Bus1=108.1.2.3 Bus2=300.1.2.3 LineCode=3 Length=1 units=kft
New Line.L109 Phases=1 Bus1=109.1 Bus2=110.1 LineCode=9 Length=0.3 units=kft
New Line.L110 Phases=1 Bus1=110.1 Bus2=111.1 LineCode=9 Length=0.575 units=kft
New Line.L111 Phases=1 Bus1=110.1 Bus2=112.1 LineCode=9 Length=0.125 units=kft
New Line.L112 Phases=1 Bus1=112.1 Bus2=113.1 LineCode=9 Length=0.525 units=kft
New Line.L113 Phases=1 Bus1=113.1 Bus2=114.1 LineCode=9 Length=0.325 units=kft
New Line.L114 Phases=3 Bus1=135.1.2.3 Bus2=35.1.2.3 LineCode=4 Length=0.375 units=kft
New Line.L116 Phases=3 Bus1=152.1.2.3 Bus2=52.1.2.3 LineCode=1 Length=0.4 units=kft
New Line.L117 Phases=3 Bus1=160r.1.2.3 Bus2=67.1.2.3 LineCode=6 Length=0.35 units=kft
! NORMALLY CLOSED SWITCHES ARE DEFINED AS SHORT LINES
! Could also be defned by setting the Switch=Yes property
New Line.Sw1 phases=3 Bus1=150r Bus2=149 r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
New Line.Sw2 phases=3 Bus1=13 Bus2=152 r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
New Line.Sw3 phases=3 Bus1=18 Bus2=135 r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
New Line.Sw4 phases=3 Bus1=60 Bus2=160 r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
New Line.Sw5 phases=3 Bus1=97 Bus2=197 r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
New Line.Sw6 phases=3 Bus1=61 Bus2=61s r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
! NORMALLY OPEN SWITCHES; DEFINED AS SHORT LINE TO OPEN BUS SO WE CAN SEE OPEN POINT VOLTAGES.
! COULD ALSO BE DEFINED AS DISABLED OR THE TERMINCAL COULD BE OPENED AFTER BEING DEFINED
New Line.Sw7 phases=3 Bus1=151 Bus2=300_OPEN r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
New Line.Sw8 phases=1 Bus1=54.1 Bus2=94_OPEN.1 r1=1e-3 r0=1e-3 x1=0.000 x0=0.000 c1=0.000 c0=0.000 Length=0.001
! LOAD TRANSFORMER AT 61s/610
! This is a 150 kVA Delta-Delta stepdown from 4160V to 480V.
New Transformer.XFM1 Phases=3 Windings=2 Xhl=2.72
~ wdg=1 bus=61s conn=Delta kv=4.16 kva=150 %r=0.635
~ wdg=2 bus=610 conn=Delta kv=0.48 kva=150 %r=0.635
! CAPACITORS
! Capacitors are 2-terminal devices. The 2nd terminal (Bus2=...) defaults to all phases
! connected to ground (Node 0). Thus, it need not be specified if a Y-connected or L-N connected
! capacitor is desired
New Capacitor.C83 Bus1=83 Phases=3 kVAR=600 kV=4.16
New Capacitor.C88a Bus1=88.1 Phases=1 kVAR=50 kV=2.402
New Capacitor.C90b Bus1=90.2 Phases=1 kVAR=50 kV=2.402
New Capacitor.C92c Bus1=92.3 Phases=1 kVAR=50 kV=2.402
!REGULATORS - REDIRECT TO DEFINITIONS FILE
! This file contains definitions for the remainder of regulators on the feeder:
Redirect IEEE123Regulators.DSS
! SPOT LOADS -- REDIRECT INPUT STREAM TO LOAD DEFINITIONS FILE
Redirect IEEE123Loads.DSS
! All devices in the test feeder are now defined.
!
! Many of the voltages are reported in per unit, so it is important to establish the base voltages at each bus so
! that we can compare with the result with greater ease.
! We will let the DSS compute the voltage bases by doing a zero-load power flow.
! There are only two voltage bases in the problem: 4160V and 480V. These must be expressed in kV
Set VoltageBases = [4.16, 0.48] ! ARRAY OF VOLTAGES IN KV
CalcVoltageBases ! PERFORMS ZERO LOAD POWER FLOW TO ESTIMATE VOLTAGE BASES