Skip to content

Latest commit

 

History

History
40 lines (25 loc) · 2.1 KB

OEP-X.mediawiki

File metadata and controls

40 lines (25 loc) · 2.1 KB

  OEP: <to be assigned>
  Title: <OEP title>
  Author: <list of authors' names and optionally, email addresses>
  Type: <Standard | Informational | Meta>
  Status: Draft
  Created: <date created on, in ISO 8601 (yyyy-mm-dd) format>
  Requires (*optional): <OEP number(s)>
  Replaces (*optional): <OEP number(s)>

Table of Contents

Abstract

A short (~200 words) description of the technical issue being addressed.

Motivation

The motivation is critical for OEPs that want to change the ONT protocol. It should clearly explain why the existing protocol specification is inadequate to address the problem that the OEP solves. OEP submissions without sufficient motivation may be rejected outright.

Specification

The technical specification should describe the syntax and semantics of any new feature. The specification should be detailed enough to allow competing, interoperable implementations for any of the current ONT platforms.

Rationale

The rationale fleshes out the specification by describing what motivated the design and why particular design decisions were made. It should describe alternate designs that were considered and related work, e.g. how the feature is supported in other languages.

The rationale may also provide evidence of consensus within the community, and should discuss important objections or concerns raised during discussion.

Backwards Compatibility

All OEPs that introduce backwards incompatibilities must include a section describing these incompatibilities and their severity. The OEP must explain how the author proposes to deal with these incompatibilities. OEP submissions without a sufficient backwards compatibility treatise may be rejected outright.

Test Cases

Test cases for an implementation are mandatory for OEPs that are affecting consensus changes. Other OEPs can choose to include links to test cases if applicable.

Implementation

The implementations must be completed before any OEP is given status "Final", but it need not be completed before the OEP is accepted. It is better to finish the specification and rationale first and reach consensus on it before writing code.