diff --git a/docs/lumen/pack-out/index.md b/docs/lumen/pack-out/index.md index 3c29066..157d47b 100644 --- a/docs/lumen/pack-out/index.md +++ b/docs/lumen/pack-out/index.md @@ -154,7 +154,7 @@ Confirm the `lower-foam-tray` matches the image shown below before continuing: ### Packaging misc. parts * Insert the following items into the **right-side** cavity of `upper-foam-tray` - !!!note "Packaging each of the following items while inspect them for their given QC inspection criteria" + !!!note "Package each of the following items while inspecting them for their given QC inspection criteria" * `front-drag-chain-mount` - confirm 2x `M5-hex-nut` installed into print * `aux-staging-plate-foot` - confirm top-side M3 bolt and bottom-side `rubber-foot` @@ -199,7 +199,7 @@ Confirm the `lower-foam-tray` matches the image shown below before continuing: * `Front-feeder-rail` QC: * `Slot #1` - `#Slot 25` are installed sequentially from left to right * Wiggle all of the installed slots to ensure none are loose, retightening any if needed - * Confirm the slit in the `2x3-idc-connector` faces towards the left of the `feeder-slot` + * Confirm the slit in every `2x3-idc-connector` faces towards the left of each `feeder-slot` * The 2x installed `corner-bracket` pieces are flush to the `2020-alu-extrusion` * The 2x installed `corner-bracket` pieces each have a spare `M5x8-bolt` and `M5-t-nut` installed into the unused holes * Total 2x `M5x8-bolt` and `M5-t-nut` @@ -209,16 +209,15 @@ Confirm the `lower-foam-tray` matches the image shown below before continuing: * `Slot #26` - `#Slot 50` are installed sequentially from left to right * Confirm that `#Slot 50` is printed in yellow plastic * Wiggle all of the installed slots to ensure none are loose, retightening any if needed - * Confirm the slit in the `2x3-idc-connector` faces towards the left of the `feeder-slot` + * Confirm the slit in every `2x3-idc-connector` faces towards the left of each `feeder-slot` * The 4x installed `corner-bracket` pieces are flush to the `2020-alu-extrusion` * The 4x installed `corner-bracket` pieces each have a spare `M5x8-bolt` and `M5-t-nut` installed into the unused holes * Total 4x `M5x8-bolt` and `M5-t-nut` !!!success "If all checks pass, continue onward" - 2. Place the finished feeder rails into the `upper-foam-tray`" - - ![](img/removing-front-and-back-rails.jpg) + 2. Place the finished feeder rails into the `upper-foam-tray` + ![](img/removing-front-and-back-rails.jpg) ###Packaging `drag-chain`