diff --git a/docs/lumen/y-gantry/img/y-gantry-final-wiring.png b/docs/lumen/y-gantry/img/y-gantry-final-wiring.png new file mode 100644 index 0000000..46dd75f --- /dev/null +++ b/docs/lumen/y-gantry/img/y-gantry-final-wiring.png @@ -0,0 +1,3 @@ +version https://git-lfs.github.com/spec/v1 +oid sha256:d096b3ba0cb3707893bc3eeefe7e69bc7568f0870d62148196168f5f1610cbd4 +size 5465449 diff --git a/docs/lumen/y-gantry/index.md b/docs/lumen/y-gantry/index.md index 27b62f2..5d0b193 100644 --- a/docs/lumen/y-gantry/index.md +++ b/docs/lumen/y-gantry/index.md @@ -268,6 +268,10 @@ The purpose of this work instruction is to explain the assembly process for the ![](img/y-gantry-extrusion-cable-clip.png) +- Position the right-most `extrusion-cable-clamp` and the cable to match the following image: + + ![alt text](img/y-gantry-final-wiring.png) + ## Quality Checks A `y-gantry-left` that was built while following the above steps will match the following image. @@ -285,7 +289,7 @@ Confirm this by inspecting the completed `y-gantry-left` assembly with the follo * 1x `M5-hex-nut` pressed into bottom of `back-leg` * 2x `M5-hex-nut` pressed into `y-gantry` -* `GT2-belt` has been trimmed to appropriate length (flush on 1 side, approx. 15mm on the other) +* `GT2-belt` has been trimmed to appropriate length (flush on `front-right-leg` side, approx. 15mm on `back-leg` side) * `GT2-belt` has been correctly tensioned * `Tensioner-arm` is installed on `front-left-leg` in the correct orientation (IE acorn-nut facing touches leg) * `Linear-rail` is centered atop `aluminum-extrusion`