Coffee bar is a Manufacture (production emulation) #1
sergeifedorenko
started this conversation in
Ideas
Replies: 0 comments
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
-
Introduction
We have 3 units of equipment
We have 4 basic operations in a coffee bar
We've created 1 template in Manifest named "Brewing espresso"
The template includes 4 job steps
We've connected 5s to Manifest's ERP system
We've created 4 zones in 5s
We've selected the operation from each job-step of "Brewing espresso" template for each zone
Equipment utilization / Production efficiency
Two numbers must be assigned to each piece of equipment
1 - Payback period (for ex 12 months).
2 - Loading rate
This means that at least once a human hand must appear in the equipment area.
CALCULATION
12 months (365 days) * 8 hours * 60 minutes = 175.200 minutes
175.200 / 10 minutes= 17.520 times need for full payback
17.520 times the number of operations required to pay back the equipment
DASHBOARD
We have 3 equipment items (we made 100 espresso)
Every 10 minutes in case the 5sControl system failed to register hand movements in the equipment area
Losses will increase
Safety
We create dangerous zone
If a human hand appears in the area, a security breach report will be instantly generated in the 5s reporting system
Beta Was this translation helpful? Give feedback.
All reactions