We will propose moving to bi-weekly meetings starting from Friday, May 26th, unless we determine at that time more frequent, weekly meetings are still needed to assist with TSSC2 Spack preparation, deployment, and testing.
2. Planned Maintenance on Expanse
Date(s) of maintenance: Monday, May 8th - Tuesday, May 9th
Update operating system from Rocky 8.5 to Rocky 8.7
Update Infiniband driver from Mellanox OFED 4.9-4.1.7 to Mellanox OFED 5.8-1.1.2
Update Lustre client from lfs 2.12.8_6_g5457c37 to lfs 2.15.2
Update NVIDIA GPU driver from NVIDIA 510.39.01 CUDA 11.6 to NVIDIA 515.65.01 CUDA 11.7
The initial deployments of both new production Spack instances expanse/0.17.3/cpu/b and expanse/0.17.3/gpu/b are now effectively complete, except for a few additional package builds that are currently being attempted in expanse/0.17.3/gpu/b. This includes packages like Amber, LAMMPS, and VASP.
Re-running of standard benchmark tests remains on-going and are planned to continue into the weekend.
Other tasks to complete before Monday:
Commit deployment record for expanse/0.17.3/gpu/b back to the sdsc/spack repo.
Change default lmod module for some Spack packages, where appropriate. e.g., openblas
Other tasks to attempt to complete before Thursday:
Complete the initial draft of the CONTRIBUTING.md and DEPLOYMENT.md guides, which will provide SDSC team members with the documentation necessary to contribute to the sdsc/spack repository and deploy new spec build scripts into existing production instances
3. Open issues for expanse/0.17.3/cpu/b and expanse/0.17.3/gpu/b
Ready to close:
None. Note, however, in preparation for this meeting we have closed out all remaining issues that were resolved from the pre-production testing conducted on expanse/0.17.3/cpu/a and expanse/0.17.3/gpu/a. All unresolved issues will be addressed with the new production instances following the planned maintenance next week.
reacted with thumbs up emoji reacted with thumbs down emoji reacted with laugh emoji reacted with hooray emoji reacted with confused emoji reacted with heart emoji reacted with rocket emoji reacted with eyes emoji
-
Attendance
Agenda
1. Next Meeting: Friday, May 26th
Upcoming vacation(s):
We will propose moving to bi-weekly meetings starting from Friday, May 26th, unless we determine at that time more frequent, weekly meetings are still needed to assist with TSSC2 Spack preparation, deployment, and testing.
2. Planned Maintenance on Expanse
Date(s) of maintenance: Monday, May 8th - Tuesday, May 9th
The initial deployments of both new production Spack instances
expanse/0.17.3/cpu/b
andexpanse/0.17.3/gpu/b
are now effectively complete, except for a few additional package builds that are currently being attempted inexpanse/0.17.3/gpu/b
. This includes packages like Amber, LAMMPS, and VASP.Re-running of standard benchmark tests remains on-going and are planned to continue into the weekend.
Other tasks to complete before Monday:
expanse/0.17.3/gpu/b
back to the sdsc/spack repo.Other tasks to attempt to complete before Thursday:
3. Open issues for
expanse/0.17.3/cpu/b
andexpanse/0.17.3/gpu/b
Ready to close:
expanse/0.17.3/cpu/a
andexpanse/0.17.3/gpu/a
. All unresolved issues will be addressed with the new production instances following the planned maintenance next week.Ready for testing:
Open runtime problems:
Open build problems:
Still need to build test:
Updates from @nwolter.
4. Planning and Preparation for Deployment of Spack on TSCC2
Expected date of deployment: Summer 2023
Updates from @jerrypgreenberg.
5. Upcoming work and/or development issues
expanse/0.17.3/cpu
andexpanse/0.17.3/gpu
instancesReferences: