You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Provide a hardening guide for Shipwright, with an emphasis on best practices when the "SHIP-0039: Build Scheduler Options" feature is enabled. Allowing builds to be scheduled on control plane (or other system/specialized) nodes could risk availability of co-located workloads.
adambkaplan
changed the title
Website: Hardening guideline for SHIP-0039
SHIP-0039: Hardening guideline for build scheduler options feature
Jun 26, 2024
Feature
Provide a hardening guide for Shipwright, with an emphasis on best practices when the "SHIP-0039: Build Scheduler Options" feature is enabled. Allowing builds to be scheduled on control plane (or other system/specialized) nodes could risk availability of co-located workloads.
Refer to the enahancement proposal for the particular details.
The text was updated successfully, but these errors were encountered: