Skip to content

I24 serial: beamline test fixes #2291

I24 serial: beamline test fixes

I24 serial: beamline test fixes #2291

Triggered via pull request January 28, 2025 16:11
Status Failure
Total duration 6h 3m 57s
Artifacts 2

ci.yml

on: pull_request
Matrix: test
pypi  /  upload
pypi / upload
release  /  artifacts
release / artifacts
Fit to window
Zoom out
Zoom in

Annotations

4 errors
test (ubuntu-latest, 3.12) / run
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 360 minutes.
test (ubuntu-latest, 3.12) / run
The operation was canceled.
test (ubuntu-latest, 3.11) / run
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 360 minutes.
test (ubuntu-latest, 3.11) / run
The operation was canceled.

Artifacts

Produced during runtime
Name Size
dist
1000 KB
docs
2.44 MB