Skip to content

Update test_pr_and_main.yml #13

Update test_pr_and_main.yml

Update test_pr_and_main.yml #13

Triggered via push January 24, 2024 18:47
Status Failure
Total duration 1m 10s
Artifacts
Check code formatting (Black)
6s
Check code formatting (Black)
Check Spelling
22s
Check Spelling
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

14 errors
ubuntu-latest/3.8
Process completed with exit code 2.
ubuntu-latest/3.11
Process completed with exit code 2.
ubuntu-latest/3.10
The job was canceled because "ubuntu-latest_3_11" failed.
ubuntu-latest/3.10
Process completed with exit code 2.
ubuntu-latest/3.9
The job was canceled because "ubuntu-latest_3_11" failed.
ubuntu-latest/3.9
Process completed with exit code 2.
windows-latest/3.10
The job was canceled because "ubuntu-latest_3_11" failed.
windows-latest/3.10
The operation was canceled.
windows-latest/3.9
The job was canceled because "ubuntu-latest_3_11" failed.
windows-latest/3.9
The operation was canceled.
windows-latest/3.11
The job was canceled because "ubuntu-latest_3_11" failed.
windows-latest/3.11
The operation was canceled.
windows-latest/3.8
The job was canceled because "ubuntu-latest_3_11" failed.
windows-latest/3.8
The operation was canceled.