Skip to content

fix typo

fix typo #223

Triggered via push October 25, 2023 18:02
Status Failure
Total duration 2m 10s
Artifacts

gnu.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

16 errors
build (NCEP_st2)
Process completed with exit code 2.
build (Ifremer1)
Process completed with exit code 2.
build (NCEP_glwu)
The job was canceled because "NCEP_st2" failed.
build (NCEP_glwu)
Process completed with exit code 2.
build (NCEP_st4sbs)
The job was canceled because "NCEP_st2" failed.
build (NCEP_st4sbs)
The operation was canceled.
build (OASACM)
The job was canceled because "NCEP_st2" failed.
build (OASACM)
The operation was canceled.
build (MULTI_ESMF)
The job was canceled because "NCEP_st2" failed.
build (MULTI_ESMF)
The operation was canceled.
build (NCEP_st4)
The job was canceled because "NCEP_st2" failed.
build (NCEP_st4)
The operation was canceled.
build (UKMO)
The job was canceled because "NCEP_st2" failed.
build (UKMO)
The operation was canceled.
build (ite_pdlib)
The job was canceled because "NCEP_st2" failed.
build (ite_pdlib)
The operation was canceled.