Add frequency distribution calculation for tidal turbine design with #4357
Triggered via push
October 9, 2024 18:07
Status
Failure
Total duration
6h 40m 13s
Billable time
5h 49m
Artifacts
–
ci.yml
on: push
Matrix: build-mac
Matrix: build-ubuntu
Matrix: build-windows
Annotations
6 errors
build-ubuntu (3.10)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 360 minutes.
|
build-ubuntu (3.10)
The operation was canceled.
|
build-mac (macos-latest)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
|
build-mac (macos-latest)
The operation was canceled.
|
build-mac (macos-14-large)
The job was canceled because "macos-latest" failed.
|
build-mac (macos-14-large)
The operation was canceled.
|