Skip to content

Geothermal cost calculation updates for Pydoc #101

Geothermal cost calculation updates for Pydoc

Geothermal cost calculation updates for Pydoc #101

Triggered via push January 23, 2025 07:02
Status Failure
Total duration 2m 13s
Billable time 9m
Artifacts

test_pkg.yml

on: push
Matrix: build_1
Matrix: build_2
Matrix: build_3
Fit to window
Zoom out
Zoom in

Annotations

37 errors and 1 warning
macos-14 3.12
Process completed with exit code 1.
macos-14 3.11
The job was canceled because "macos-14_3_12" failed.
macos-14 3.11
Process completed with exit code 1.
macos-14 3.8
The job was canceled because "macos-14_3_12" failed.
macos-14 3.8
Process completed with exit code 1.
ubuntu-latest 3.12
Process completed with exit code 1.
macos-14 3.9
The job was canceled because "macos-14_3_12" failed.
macos-14 3.9
The operation was canceled.
ubuntu-latest 3.11
The job was canceled because "ubuntu-latest_3_12" failed.
ubuntu-latest 3.11
The operation was canceled.
ubuntu-latest 3.10
The job was canceled because "ubuntu-latest_3_12" failed.
ubuntu-latest 3.10
The operation was canceled.
macos-14 3.10
The job was canceled because "macos-14_3_12" failed.
macos-14 3.10
The operation was canceled.
windows-2019 3.12
The job was canceled because "ubuntu-latest_3_12" failed.
windows-2019 3.12
The operation was canceled.
ubuntu-latest 3.8
The job was canceled because "ubuntu-latest_3_12" failed.
ubuntu-latest 3.8
The operation was canceled.
windows-2019 3.8
The job was canceled because "ubuntu-latest_3_12" failed.
windows-2019 3.8
The operation was canceled.
windows-2019 3.11
The job was canceled because "ubuntu-latest_3_12" failed.
windows-2019 3.11
The operation was canceled.
windows-2019 3.9
The job was canceled because "ubuntu-latest_3_12" failed.
windows-2019 3.9
The operation was canceled.
windows-2019 3.10
The job was canceled because "ubuntu-latest_3_12" failed.
windows-2019 3.10
The operation was canceled.
ubuntu-latest 3.9
The job was canceled because "ubuntu-latest_3_12" failed.
ubuntu-latest 3.9
The operation was canceled.
macos-14-large 3.12
Process completed with exit code 1.
macos-14-large 3.10
The job was canceled because "macos-14-large_3_12" failed.
macos-14-large 3.10
The operation was canceled.
macos-14-large 3.8
The job was canceled because "macos-14-large_3_12" failed.
macos-14-large 3.8
The operation was canceled.
macos-14-large 3.11
The job was canceled because "macos-14-large_3_12" failed.
macos-14-large 3.11
The operation was canceled.
macos-14-large 3.9
The job was canceled because "macos-14-large_3_12" failed.
macos-14-large 3.9
The operation was canceled.
ubuntu-latest 3.12
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636