Add rolling stocks categories #18848
build.yml
on: pull_request
Matrix: Build
Check dockerfiles
10s
Check scripts
3s
Check generated railjson sync
21s
Check railjson generator
1m 52s
Check commits
9s
Check final newline
55s
Check integration tests
1m 27s
Check osrd schema
39s
Check toml
6s
Check infra schema sync
16s
Check reuse compliance
11s
Check front rtk sync
0s
Check core
0s
Check editoast tests
0s
Check editoast lints
0s
Check editoast openapi
0s
Check gateway
0s
Check osrdyne
0s
Check front
0s
Integration tests
0s
End to end tests
0s
Annotations
6 errors
Check toml
Process completed with exit code 1.
|
Build (front-tests)
Process completed with exit code 1.
|
Build (gateway-test, gateway-standalone, gateway-front)
The job was canceled because "front-tests" failed.
|
Build (gateway-test, gateway-standalone, gateway-front)
Process completed with exit code 1.
|
Build (editoast, editoast-test)
The job was canceled because "front-tests" failed.
|
Build (editoast, editoast-test)
The operation was canceled.
|