Upgrade all crates to the 2024 edition and bump MSRV to 1.85 #900
Annotations
4 errors
test (x86_64-unknown-linux-gnu, 1.85.0)
The strategy configuration was canceled because "test.x86_64-unknown-linux-gn_2" failed
|
test (x86_64-unknown-linux-gnu, stable)
Process completed with exit code 101.
|
test (i686-unknown-linux-gnu, stable, sudo apt update && sudo apt install gcc-multilib)
The operation was canceled.
|
test (i686-unknown-linux-gnu, stable, sudo apt update && sudo apt install gcc-multilib)
The strategy configuration was canceled because "test.x86_64-unknown-linux-gn_2" failed
|