Skip to content

[cdc-connector][oracle]Flink cdc pipeline support oracle source #913

[cdc-connector][oracle]Flink cdc pipeline support oracle source

[cdc-connector][oracle]Flink cdc pipeline support oracle source #913

Triggered via pull request June 29, 2024 10:01
Status Failure
Total duration 12m 14s
Artifacts

flink_cdc.yml

on: pull_request
Matrix: compile_and_test
Fit to window
Zoom out
Zoom in

Annotations

13 errors
compile_and_test (8, pipeline_connectors)
Process completed with exit code 1.
compile_and_test (8, db2)
The job was canceled because "_8_pipeline_connectors" failed.
compile_and_test (8, db2)
The operation was canceled.
compile_and_test (8, mysql)
The job was canceled because "_8_pipeline_connectors" failed.
compile_and_test (8, mysql)
The operation was canceled.
compile_and_test (8, mongodb)
The job was canceled because "_8_pipeline_connectors" failed.
compile_and_test (8, mongodb)
The operation was canceled.
compile_and_test (8, e2e)
The job was canceled because "_8_pipeline_connectors" failed.
compile_and_test (8, e2e)
The operation was canceled.
compile_and_test (8, postgres)
The job was canceled because "_8_pipeline_connectors" failed.
compile_and_test (8, postgres)
The operation was canceled.
compile_and_test (8, oracle)
The job was canceled because "_8_pipeline_connectors" failed.
compile_and_test (8, oracle)
The operation was canceled.