Skip to content

feat: Add support for azure workload identity in Microsoft Entra SSO. #37658

feat: Add support for azure workload identity in Microsoft Entra SSO.

feat: Add support for azure workload identity in Microsoft Entra SSO. #37658

Triggered via pull request January 27, 2025 19:05
Status Cancelled
Total duration 23m 43s
Artifacts 2

ci-build.yaml

on: pull_request
Build & cache Go code
3m 12s
Build & cache Go code
Build, test & lint UI code
1m 29s
Build, test & lint UI code
Ensure Go modules synchronicity
23s
Ensure Go modules synchronicity
Lint Go code
3m 46s
Lint Go code
Check changes to generated code
5m 26s
Check changes to generated code
Matrix: Run end-to-end tests
Run unit tests for Go packages
5m 29s
Run unit tests for Go packages
Run unit tests with -race for Go packages
9m 22s
Run unit tests with -race for Go packages
E2E Tests - Composite result
0s
E2E Tests - Composite result
Process & analyze test artifacts
0s
Process & analyze test artifacts
Fit to window
Zoom out
Zoom in

Annotations

14 errors and 1 warning
Lint Go code: util/oidc/oidc_test.go#L483
File is not properly formatted (gofumpt)
Lint Go code: util/oidc/oidc_test.go#L504
File is not properly formatted (gofumpt)
Lint Go code: util/oidc/oidc_test.go#L484
unnecessary trailing newline (whitespace)
Lint Go code: util/oidc/oidc_test.go#L505
unnecessary trailing newline (whitespace)
Lint Go code
issues found
Run end-to-end tests (v1.30.4, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/21433/merge' exists
Run end-to-end tests (v1.30.4, false)
The operation was canceled.
Run end-to-end tests (v1.29.8, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/21433/merge' exists
Run end-to-end tests (v1.29.8, false)
The operation was canceled.
Run end-to-end tests (v1.28.13, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/21433/merge' exists
Run end-to-end tests (v1.28.13, false)
The operation was canceled.
Run end-to-end tests (v1.31.0, true)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/21433/merge' exists
Run end-to-end tests (v1.31.0, true)
The operation was canceled.
E2E Tests - Composite result
Process completed with exit code 1.
changes
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
race-results
1.3 MB
test-results
1.3 MB