Skip to content

WIP: Testing Framework with Injected CometBFT #14485

WIP: Testing Framework with Injected CometBFT

WIP: Testing Framework with Injected CometBFT #14485

Triggered via pull request February 3, 2025 16:03
Status Cancelled
Total duration 1h 17m 41s
Artifacts

pipeline.yml

on: pull_request
build-and-push-container
1m 48s
build-and-push-container
Matrix: ci
Matrix: ci-e2e
Fit to window
Zoom out
Zoom in

Annotations

23 errors
lint: testing/injected-consensus/injected-consensus.go#L144
func `runCommand` is unused (unused)
lint: testing/injected-consensus/injected-consensus.go#L156
func `initializeBeaconState` is unused (unused)
lint: testing/injected-consensus/injected-consensus.go#L273
func `genesisFromFile` is unused (unused)
lint: consensus/cometbft/service/init_chain.go#L88
Function `initChainer` should pass the context parameter (contextcheck)
lint: testing/injected-consensus/injected-consensus.go#L160
The line is 141 characters long, which exceeds the maximum of 140 characters. (lll)
lint: testing/injected-consensus/injected-consensus.go#L231
Magic number: 250_000, in <argument> detected (mnd)
lint: testing/injected-consensus/invalid_block_test.go#L84
Function TestInjectedConsensus missing the call to method parallel (paralleltest)
lint
Process completed with exit code 2.
slither
The job was canceled because "lint_ubuntu-24_04-beacon-" failed.
slither
The operation was canceled.
test-unit-fuzz
The job was canceled because "lint_ubuntu-24_04-beacon-" failed.
test-unit-fuzz
The operation was canceled.
nilaway
The job was canceled because "lint_ubuntu-24_04-beacon-" failed.
nilaway
The operation was canceled.
test-unit-cover
The job was canceled because "lint_ubuntu-24_04-beacon-" failed.
test-unit-cover
The operation was canceled.
test-unit-bench
The job was canceled because "lint_ubuntu-24_04-beacon-" failed.
test-unit-bench
The operation was canceled.
tidy-sync-check
The job was canceled because "lint_ubuntu-24_04-beacon-" failed.
tidy-sync-check
The operation was canceled.
gosec
The job was canceled because "lint_ubuntu-24_04-beacon-" failed.
gosec
The operation was canceled.
test-e2e
Canceling since a higher priority waiting request for 'ci-refs/pull/2411/merge-tests' exists