Skip to content

Revert "Fix: The deadline passed to 'waitForReady' in "GrpcClient", was a millisecond gap, but the method needs a date or a TS of the deadline" #50

Revert "Fix: The deadline passed to 'waitForReady' in "GrpcClient", was a millisecond gap, but the method needs a date or a TS of the deadline"

Revert "Fix: The deadline passed to 'waitForReady' in "GrpcClient", was a millisecond gap, but the method needs a date or a TS of the deadline" #50

Triggered via pull request May 6, 2024 16:44
Status Cancelled
Total duration 27d 14h 15m 58s
Artifacts

pr-test.yml

on: pull_request
saas_integration
0s
saas_integration
unit-tests
53s
unit-tests
unit-tests-windows
6h 0m
unit-tests-windows
local_integration
0s
local_integration
local_multitenancy_integration
0s
local_multitenancy_integration
saas_integration_windows
0s
saas_integration_windows
Fit to window
Zoom out
Zoom in

Annotations

5 errors
unit-tests-windows
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 360 minutes.
unit-tests-windows
The operation was canceled.
local_integration
The run was canceled by @jwulf.
local_multitenancy_integration
The run was canceled by @jwulf.
saas_integration
The run was canceled by @jwulf.