Extend the wwan connection tests to support multiple cycle connection tests (New) #1574
Triggered via pull request
September 27, 2024 08:27
Status
Failure
Total duration
1m 18s
Artifacts
–
tox-provider-base.yaml
on: pull_request
Matrix: Test provider-base with tox
Annotations
8 errors and 1 warning
Test provider-base with tox (3.8)
Process completed with exit code 1.
|
Test provider-base with tox (3.10)
The job was canceled because "_3_8" failed.
|
Test provider-base with tox (3.10)
The operation was canceled.
|
Test provider-base with tox (3.6)
The job was canceled because "_3_8" failed.
|
Test provider-base with tox (3.6)
The operation was canceled.
|
Test provider-base with tox (3.5)
The job was canceled because "_3_8" failed.
|
Test provider-base with tox (3.5)
You are using pip version 20.3.4, however version 24.2 is available.
You should consider upgrading via the 'pip install --upgrade pip' command.
|
Test provider-base with tox (3.5)
The operation was canceled.
|
Test provider-base with tox (3.8)
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/setup-python@v4. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|