Skip to content

chore(deps): update dependency charset-normalizer to v3.4.0 #309

chore(deps): update dependency charset-normalizer to v3.4.0

chore(deps): update dependency charset-normalizer to v3.4.0 #309

Triggered via pull request October 9, 2024 09:46
Status Failure
Total duration 3m 10s
Artifacts 1

integration_test.yaml

on: pull_request
charm-integration-test  /  Plan
9s
charm-integration-test / Plan
Matrix: charm-integration-test / build
Matrix: charm-integration-test / Integration tests / Integration tests
Waiting for pending jobs
charm-integration-test  /  Plan Image Scanning
0s
charm-integration-test / Plan Image Scanning
charm-integration-test  /  Required Integration Test Status Checks
0s
charm-integration-test / Required Integration Test Status Checks
Matrix: charm-integration-test / scan
Fit to window
Zoom out
Zoom in

Annotations

4 errors
charm-integration-test / Build rock (repo-policy-compliance)
The process '/snap/bin/rockcraft' failed with exit code 1
charm-integration-test / Build charm (repo-policy-compliance)
The job was canceled because "rock_repo-policy-complian" failed.
charm-integration-test / Build charm (repo-policy-compliance)
The operation was canceled.
charm-integration-test / Required Integration Test Status Checks
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
2024-10-09T09-46-48-91e4__plan
338 Bytes