Skip to content

all ErrConnClosed

all ErrConnClosed #898

Triggered via push November 28, 2023 08:37
Status Failure
Total duration 2m 7s
Artifacts

pr-check.yml

on: push
Matrix: compatibility-test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
compatibility-test (1.20, X64)
Process completed with exit code 1.
compatibility-test (1.15, X64)
The job was canceled because "_1_20_X64" failed.
compatibility-test (1.15, X64)
Process completed with exit code 1.
compatibility-test (1.15, ARM64)
The job was canceled because "_1_20_X64" failed.
compatibility-test (1.15, ARM64)
The operation was canceled.
compatibility-test (1.20, ARM64)
The job was canceled because "_1_20_X64" failed.
compatibility-test (1.20, ARM64)
The operation was canceled.