Skip to content

Add serialization documentation #90

Add serialization documentation

Add serialization documentation #90

Triggered via push April 29, 2024 14:41
Status Cancelled
Total duration 2m 22s
Billable time 9m
Artifacts

ci.yml

on: push
Matrix: Build and Test
Matrix: Generate Site
Matrix: Publish Artifacts
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Build and Test (ubuntu-latest, 3, temurin@8, rootJVM)
Canceling since a higher priority waiting request for 'Continuous Integration @ refs/heads/site/bootstrap' exists
Build and Test (ubuntu-latest, 3, temurin@8, rootJVM)
The operation was canceled.
Generate Site (ubuntu-latest, temurin@11)
Canceling since a higher priority waiting request for 'Continuous Integration @ refs/heads/site/bootstrap' exists
Generate Site (ubuntu-latest, temurin@11)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13, temurin@8, rootJVM)
Canceling since a higher priority waiting request for 'Continuous Integration @ refs/heads/site/bootstrap' exists
Build and Test (ubuntu-latest, 2.13, temurin@8, rootJVM)
The operation was canceled.