Skip to content

Process with message handler #139

Process with message handler

Process with message handler #139

Triggered via push May 24, 2024 09:59
Status Cancelled
Total duration 1m 23s
Artifacts

ci.yml

on: push
Matrix: Build and Test
Matrix: Generate Site
Matrix: Publish Artifacts
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Generate Site (ubuntu-latest, temurin@11)
Process completed with exit code 1.
Build and Test (ubuntu-latest, 3, temurin@8, rootJVM)
Canceling since a higher priority waiting request for 'Continuous Integration @ refs/heads/message-handler' exists
Build and Test (ubuntu-latest, 3, temurin@8, rootJVM)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13, temurin@8, rootJVM)
Canceling since a higher priority waiting request for 'Continuous Integration @ refs/heads/message-handler' exists
Build and Test (ubuntu-latest, 2.13, temurin@8, rootJVM)
The operation was canceled.