Skip to content

parallel import negative test #80

parallel import negative test

parallel import negative test #80

Triggered via push December 18, 2023 21:36
Status Failure
Total duration 2h 20m 21s
Artifacts 11

zfs-linux.yml

on: push
Matrix: Build
Matrix: Testing
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Testing (22.04) / zloop
Process completed with exit code 1.
Testing (20.04) / zloop
Process completed with exit code 1.
Testing (20.04) / functional (part1)
Process completed with exit code 1.
Testing (20.04) / functional (part2)
Process completed with exit code 1.
Testing (22.04) / functional (part2)
Process completed with exit code 1.
Testing (22.04) / functional (part3)
The action has timed out.
Testing (20.04) / functional (part3)
The action has timed out.

Artifacts

Produced during runtime
Name Size
Logs-20.04-functional Expired
18.6 MB
Logs-20.04-sanity Expired
5.1 MB
Logs-22.04-functional Expired
18.4 MB
Logs-22.04-sanity Expired
5.12 MB
Summary Files Expired
997 KB
Zpool-files-20.04 Expired
3.32 GB
Zpool-files-22.04 Expired
4.27 GB
Zpool-logs-20.04 Expired
982 MB
Zpool-logs-22.04 Expired
3.11 GB
modules-20.04 Expired
60 MB
modules-22.04 Expired
59.6 MB