Skip to content

chore(deps): update dependency @intlify/core to v10 #43030

chore(deps): update dependency @intlify/core to v10

chore(deps): update dependency @intlify/core to v10 #43030

Triggered via pull request November 15, 2024 20:55
Status Failure
Total duration 22m 3s
Artifacts 2

continuous-integration.yml

on: pull_request
api-check-needed
4s
api-check-needed
Tests: Print
59s
Tests: Print
Tests: PDF
28s
Tests: PDF
e2e-check-needed
5s
e2e-check-needed
frontend-check-needed
8s
frontend-check-needed
Lint: ClientPrint (ESLint)
20s
Lint: ClientPrint (ESLint)
Lint: Print (ESLint)
25s
Lint: Print (ESLint)
Tests: API
0s
Tests: API
Lint: API (php-cs-fixer)
0s
Lint: API (php-cs-fixer)
Tests: End-to-end build  /  Tests: End-to-end (build job)
43s
Tests: End-to-end build / Tests: End-to-end (build job)
Lint: e2e (ESLint)
20s
Lint: e2e (ESLint)
Tests: Frontend
41s
Tests: Frontend
Lint: Frontend (ESLint)
36s
Lint: Frontend (ESLint)
Matrix: Tests: End-to-end run / Tests: End-to-end
Finish coveralls report
0s
Finish coveralls report
workflow-success
2s
workflow-success
Send out CI success event
0s
Send out CI success event
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 13 warnings
Tests: Frontend
Process completed with exit code 1.
Tests: End-to-end run / Tests: End-to-end (chrome)
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 20 minutes.
Tests: End-to-end run / Tests: End-to-end (chrome)
The operation was canceled.
Tests: End-to-end run / Tests: End-to-end (firefox)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 20 minutes.
Tests: End-to-end run / Tests: End-to-end (firefox)
The operation was canceled.
Tests: End-to-end run / Tests: End-to-end (edge)
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 20 minutes.
Tests: End-to-end run / Tests: End-to-end (edge)
The operation was canceled.
workflow-success
Job frontend-tests failed with status failure
workflow-success
Job e2e-tests-run failed with status failure
Lint: Frontend (ESLint): frontend/src/components/activity/content/layout/ContentNodeCard.vue#L157
Need to pass argument to the `::v-deep` pseudo-element
Tests: End-to-end run / Tests: End-to-end (chrome)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.
Tests: End-to-end run / Tests: End-to-end (firefox)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.
Tests: End-to-end run / Tests: End-to-end (edge)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
e2e-tests-images
225 MB
ecamp~ecamp3~FWP0JW.dockerbuild
62.5 KB