Add publish to up-streamer rust #27
unbundled-lint-and-test.yaml
on: pull_request
obtain_and_build_vsomeip
10s
Annotations
3 errors and 7 warnings
Lint
Process completed with exit code 1.
|
Test
Canceling since a higher priority waiting request for 'refs/pull/20/merge-Lint and Test - Unbundled' exists
|
Test
The operation was canceled.
|
obtain_and_build_vsomeip
The following actions uses Node.js version which is deprecated and will be forced to run on node20: actions/cache@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|
Build documentation
The following actions uses Node.js version which is deprecated and will be forced to run on node20: actions/cache@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|
Lint
The following actions uses Node.js version which is deprecated and will be forced to run on node20: actions/cache@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|
Test
Failed to download action 'https://api.github.com/repos/dtolnay/rust-toolchain/tarball/d0e72ca3bfdc51937a4f81431ccbed269ef9f2a2'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
Test
Back off 26.508 seconds before retry.
|
Test
Failed to download action 'https://api.github.com/repos/dtolnay/rust-toolchain/tarball/d0e72ca3bfdc51937a4f81431ccbed269ef9f2a2'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
Test
Back off 11.122 seconds before retry.
|