Skip to content

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5 #434

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5 #434

Triggered via pull request January 4, 2024 21:16
Status Failure
Total duration 43s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

go.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 6 warnings
Test on go 1.19
Docker build failed with exit code 1
Test on go 1.21
The job was canceled because "_1_19" failed.
Test on go 1.21
The operation was canceled.
Test on go 1.20
The job was canceled because "_1_19" failed.
Test on go 1.20
The operation was canceled.
Test on go 1.19
Docker build failed with exit code 1, back off 7.194 seconds before retry.
Test on go 1.19
Docker build failed with exit code 1, back off 1.843 seconds before retry.
Test on go 1.21
Docker build failed with exit code 1, back off 6.33 seconds before retry.
Test on go 1.21
Docker build failed with exit code 1, back off 3.622 seconds before retry.
Test on go 1.20
Docker build failed with exit code 1, back off 7.085 seconds before retry.
Test on go 1.20
Docker build failed with exit code 1, back off 6.793 seconds before retry.