Skip to content

Commit

Permalink
Add instructions for o-ring installation
Browse files Browse the repository at this point in the history
  • Loading branch information
nooges committed Dec 12, 2024
1 parent cffaba5 commit d64cb35
Showing 1 changed file with 9 additions and 2 deletions.
11 changes: 9 additions & 2 deletions docs/iris-lm-build-guide.md
Original file line number Diff line number Diff line change
Expand Up @@ -15,10 +15,13 @@ Get your parts ready:
* [Iris LM-G Rev. 1 PCBs](https://keeb.io/products/iris-lm-g-pcb-kit)
* Iris LM Case
* [Aluminum version](https://keeb.io/products/iris-lm-aluminum-case)
* 8mm M2 screws
* Silicone tray liners
* Switch plate support foam
* [USB-C to USB-C cable](https://keeb.io/products/usb-c-to-usb-c-cable)
* [56 Low-Profile Switches](https://keeb.io/collections/switches?filter.p.m.keyboard.switch_compatibility=Choc+V1+Low-Profile&filter.p.m.keyboard.switch_compatibility=Choc+V2+Low-Profile&filter.p.m.keyboard.switch_compatibility=Gateron+Low-Profile&sort_by=best-selling)

<!-- ![](./assets/images/iris-ce/iris-ce-parts.jpg) -->
<!-- ![](./assets/images/iris-lm/iris-lm-parts.jpg) -->

## Build Steps Summary

Expand Down Expand Up @@ -80,7 +83,11 @@ It's best to test using the [Key Tester in VIA](via#key-tester-tab) with `Test M

Now that all of the switches have been inserted, it's time to assemble the case.

First place the plate assembly into the tray.
(Option) Place an o-ring over each of the mounting points. This will provide some cushion between the top portion of the build from the tray bottom of the case.

<!-- ![](./assets/images/iris-lm/IMG_3706.jpeg) -->

Next, place the plate assembly into the tray.

![](./assets/images/iris-lm/IMG_3706.jpeg)

Expand Down

0 comments on commit d64cb35

Please sign in to comment.