Skip to content

Continuous Integration #6

Continuous Integration

Continuous Integration #6

Triggered via schedule March 25, 2024 00:30
Status Failure
Total duration 1m 15s
Artifacts

ci.yml

on: schedule
container-check
1m 5s
container-check
project-check
34s
project-check
Matrix: golang-check
Fit to window
Zoom out
Zoom in

Annotations

5 errors
golang-check (1.20)
Process completed with exit code 2.
golang-check (1.21)
The job was canceled because "_1_20" failed.
golang-check (1.21)
The operation was canceled.
golang-check (1.22)
The job was canceled because "_1_20" failed.
golang-check (1.22)
The operation was canceled.