chore(deps): update module github.com/imdario/mergo to v1 #814
ci.yml
on: pull_request
Lint Go files
43s
Lint Helm charts
20s
Unit tests
9s
Build Docker image
35s
Matrix: E2E tests
Annotations
15 errors and 2 warnings
Unit tests
missing go.sum entry for module providing package github.com/imdario/mergo (imported by k8s.io/client-go/tools/clientcmd); to add:
|
Unit tests
Process completed with exit code 2.
|
Build Docker image
buildx failed with: ERROR: failed to solve: process "/bin/sh -c go mod download" did not complete successfully: exit code: 1
|
Lint Go files
golangci-lint exit with code 3
|
E2E tests (v1.31.1)
Process completed with exit code 1.
|
E2E tests (v1.29.9)
The job was canceled because "v1_31_1" failed.
|
E2E tests (v1.29.9)
The operation was canceled.
|
E2E tests (v1.30.5)
The job was canceled because "v1_31_1" failed.
|
E2E tests (v1.30.5)
The operation was canceled.
|
E2E tests (v1.26.15)
The job was canceled because "v1_31_1" failed.
|
E2E tests (v1.26.15)
The operation was canceled.
|
E2E tests (v1.27.16)
The job was canceled because "v1_31_1" failed.
|
E2E tests (v1.27.16)
The operation was canceled.
|
E2E tests (v1.28.14)
The job was canceled because "v1_31_1" failed.
|
E2E tests (v1.28.14)
The operation was canceled.
|
Build Docker image
No Docker image version has been generated. Check tags input.
|
Build Docker image
No Docker tag has been generated. Check tags input.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
newrelic~k8s-agents-operator~IO2GW5.dockerbuild
|
40.8 KB |
|