Skip to content

chore(deps): update module github.com/imdario/mergo to v1 #838

chore(deps): update module github.com/imdario/mergo to v1

chore(deps): update module github.com/imdario/mergo to v1 #838

Triggered via push October 30, 2024 18:40
Status Failure
Total duration 2m 35s
Artifacts 1

ci.yml

on: push
Lint Go files
1m 48s
Lint Go files
Lint Helm charts
14s
Lint Helm charts
Unit tests
12s
Unit tests
Build Docker image
33s
Build Docker image
Matrix: E2E tests
Fit to window
Zoom out
Zoom in

Annotations

14 errors and 2 warnings
Unit tests
missing go.sum entry for module providing package github.com/imdario/mergo (imported by k8s.io/client-go/tools/clientcmd); to add:
Unit tests
Process completed with exit code 2.
Build Docker image
buildx failed with: ERROR: failed to solve: process "/bin/sh -c go mod download" did not complete successfully: exit code: 1
Lint Go files
golangci-lint exit with code 3
E2E tests (v1.31.1)
Process completed with exit code 1.
E2E tests (v1.26.15)
Process completed with exit code 1.
E2E tests (v1.29.9)
The job was canceled because "v1_31_1" failed.
E2E tests (v1.29.9)
The operation was canceled.
E2E tests (v1.30.5)
The job was canceled because "v1_31_1" failed.
E2E tests (v1.30.5)
The operation was canceled.
E2E tests (v1.28.14)
The job was canceled because "v1_31_1" failed.
E2E tests (v1.28.14)
The operation was canceled.
E2E tests (v1.27.16)
The job was canceled because "v1_31_1" failed.
E2E tests (v1.27.16)
The operation was canceled.
Build Docker image
No Docker image version has been generated. Check tags input.
Build Docker image
No Docker tag has been generated. Check tags input.

Artifacts

Produced during runtime
Name Size
newrelic~k8s-agents-operator~LW7D8U.dockerbuild
40.9 KB