-
Notifications
You must be signed in to change notification settings - Fork 106
Pull requests: openshift/cluster-node-tuning-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
Switch builder image to multi-arch image
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#1297
opened Feb 16, 2025 by
rbaturov
Loading…
CNF-16742: kernelPageSize + hugepages combinations validation
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#1296
opened Feb 16, 2025 by
rbaturov
Loading…
OCPBUGS-49823: machineconfig: add support for various hugepage sizes
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#1295
opened Feb 13, 2025 by
rbaturov
Loading…
OCPBUGS-49823: Support hugepage size selection for ARM-based clusters
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#1294
opened Feb 5, 2025 by
rbaturov
Loading…
OCPBUGS-49403: E2E: Add configuration tests related to align cpus by uncorecache feature
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#1291
opened Jan 24, 2025 by
mrniranjan
Loading…
e2e:daemonset: pod phase and events
acknowledge-critical-fixes-only
Indicates if the issuer of the label is OK with the policy.
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#1289
opened Jan 22, 2025 by
Tal-or
Loading…
CNF-16459: Update cnf-tests image
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#1286
opened Jan 20, 2025 by
rbaturov
Loading…
Enhanced utility function for fetching container runtime
#1279
opened Jan 9, 2025 by
SargunNarula
Loading…
perfprof: add enablement annotation
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#1278
opened Jan 9, 2025 by
ffromani
Loading…
PPC: verify core with the same ID always has same sibling list and add missing test
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1235
opened Dec 3, 2024 by
shajmakh
Loading…
WIP: Use the new IRQBALANCE_BANNED_CPULIST variable
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#1227
opened Nov 26, 2024 by
MarSik
Loading…
WIP: PPC: remove ProcessorCore.Index instances
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#1225
opened Nov 26, 2024 by
shajmakh
Loading…
WIP: PPC: unit: test sortTopology for expected output
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#1217
opened Nov 14, 2024 by
shajmakh
Loading…
OCPBUGS-44559: Manage TuneD profiles with the same name and different content
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#1216
opened Nov 14, 2024 by
jmencak
Loading…
OCPBUGS-35911: E2E: Add test to verify runc process excludes the cpus used by pod.
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#1088
opened Jun 21, 2024 by
SargunNarula
Loading…
NO-JIRA: Stop exposing the entire host filesystem
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1085
opened Jun 11, 2024 by
jmencak
Loading…
OCPBUGS-25860: Disable managed interrupts for smartpqi
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/severity-important
Referenced Jira bug's severity is important for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lifecycle/rotten
Denotes an issue or PR that has aged beyond stale and will be auto-closed.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#915
opened Jan 12, 2024 by
MarSik
Loading…
ProTip!
Type g i on any issue or pull request to go back to the issue listing page.