-
Notifications
You must be signed in to change notification settings - Fork 91
Pull requests: openshift/cluster-openshift-apiserver-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
OCPBUGS-48177: Exclude etcd readiness checks from /readyz to ignore temporary etcd hiccups
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#612
opened Jan 20, 2025 by
ingvagabund
Loading…
[WIP/proof] API-1844: KMS encryption provider
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#610
opened Jan 9, 2025 by
swghosh
Loading…
wip: wrap error messages in apiservice controller for more context
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#605
opened Dec 4, 2024 by
everettraven
•
Draft
remove image APIs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#601
opened Nov 18, 2024 by
deads2k
Loading…
Updating ose-cluster-openshift-apiserver-operator images to be consistent with ART
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
bugzilla/valid-bug
Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
#520
opened Mar 1, 2023 by
openshift-bot
Loading…
ProTip!
Add no:assignee to see everything that’s not assigned.