Skip to content

Commit

Permalink
Final QC push for now
Browse files Browse the repository at this point in the history
  • Loading branch information
lucian151 committed Nov 1, 2023
1 parent c667048 commit 293c291
Showing 1 changed file with 5 additions and 6 deletions.
11 changes: 5 additions & 6 deletions docs/lumen/pack-out/index.md
Original file line number Diff line number Diff line change
Expand Up @@ -154,7 +154,7 @@ Confirm the `lower-foam-tray` matches the image shown below before continuing:
### Packaging misc. parts
* Insert the following items into the **right-side** cavity of `upper-foam-tray`

!!!note "Packaging each of the following items while inspect them for their given QC inspection criteria"
!!!note "Package each of the following items while inspecting them for their given QC inspection criteria"

* `front-drag-chain-mount` - confirm 2x `M5-hex-nut` installed into print
* `aux-staging-plate-foot` - confirm top-side M3 bolt and bottom-side `rubber-foot`
Expand Down Expand Up @@ -199,7 +199,7 @@ Confirm the `lower-foam-tray` matches the image shown below before continuing:
* `Front-feeder-rail` QC:
* `Slot #1` - `#Slot 25` are installed sequentially from left to right
* Wiggle all of the installed slots to ensure none are loose, retightening any if needed
* Confirm the slit in the `2x3-idc-connector` faces towards the left of the `feeder-slot`
* Confirm the slit in every `2x3-idc-connector` faces towards the left of each `feeder-slot`
* The 2x installed `corner-bracket` pieces are flush to the `2020-alu-extrusion`
* The 2x installed `corner-bracket` pieces each have a spare `M5x8-bolt` and `M5-t-nut` installed into the unused holes
* Total 2x `M5x8-bolt` and `M5-t-nut`
Expand All @@ -209,16 +209,15 @@ Confirm the `lower-foam-tray` matches the image shown below before continuing:
* `Slot #26` - `#Slot 50` are installed sequentially from left to right
* Confirm that `#Slot 50` is printed in yellow plastic
* Wiggle all of the installed slots to ensure none are loose, retightening any if needed
* Confirm the slit in the `2x3-idc-connector` faces towards the left of the `feeder-slot`
* Confirm the slit in every `2x3-idc-connector` faces towards the left of each `feeder-slot`
* The 4x installed `corner-bracket` pieces are flush to the `2020-alu-extrusion`
* The 4x installed `corner-bracket` pieces each have a spare `M5x8-bolt` and `M5-t-nut` installed into the unused holes
* Total 4x `M5x8-bolt` and `M5-t-nut`

!!!success "If all checks pass, continue onward"

2. Place the finished feeder rails into the `upper-foam-tray`"

![](img/removing-front-and-back-rails.jpg)
2. Place the finished feeder rails into the `upper-foam-tray`
![](img/removing-front-and-back-rails.jpg)

###Packaging `drag-chain`

Expand Down

0 comments on commit 293c291

Please sign in to comment.