Skip to content

ci: server: verify deps are coherent with the commit #81

ci: server: verify deps are coherent with the commit

ci: server: verify deps are coherent with the commit #81

Triggered via push March 31, 2024 11:06
Status Cancelled
Total duration 3m 17s
Artifacts

nix-ci.yml

on: push
Matrix: nix-build
Matrix: nix-eval
Fit to window
Zoom out
Zoom in

Annotations

6 errors
nix-eval (macos-latest)
The run was canceled by @phymbert.
nix-eval (macos-latest)
The operation was canceled.
nix-eval (ubuntu-latest)
The run was canceled by @phymbert.
nix-build (ubuntu-latest)
The run was canceled by @phymbert.
nix-build (macos-latest)
The run was canceled by @phymbert.
nix-build (macos-latest)
The operation was canceled.