Create Rule5-42.md #1537

Open
wants to merge 1 commit into
base: feature/ashrae9012022
Choose a base branch
from
Open
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
35 changes: 35 additions & 0 deletions docs/section5/Rule5-42.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,35 @@
# Envelope - Rule 5-42
**Schema Version:** 0.0.37
**Mandatory Rule:** False
**Rule ID:** 5-42

**Rule Description:** Each linear thermal bridge and point thermal bridge as identified in Section 5.5.5 shall be modeled using either of the following techniques:

a. A separate model of the assembly within the energy simulation model.
b. Adjustment of the clear-field U-factor in accordance with Section A10.2.

**Rule Assertion:** B-RMR = expected value
**Appendix G Section:** Table G3.1 Section 5(a)-1 Proposed
**Appendix G Section Reference:** 5(a)
**Data Lookup:** None
**Evaluation Context:** Evaluate each Project

**Applicability Checks:**

1. A project has an exterior wall

**Function Call:**

**Manual Check:** Ensure that linear and point thermal bridges, as identified in Section 5.5.5 are modeled using either of the following techniques:
a. A separate model of the assembly within the energy simulation model.
b. Adjustment of the clear-field U-factor in accordance with Section A10.2.

**Rule Logic:**
**Applicability:**
- look at each zone in the RMD: `for zone in P_RMD....zones:`
- look at each surface in the zone: `for surface in zone.surfaces:`
- if the surface is an exterior surface, then this rule is applicable for the entire project: `if((surface.adjacent_to == "EXTERIOR") or (surface.adjacent_to == "GROUND")): UNDETERMINED`
- if the rule logic gets here without an UNDETERMINED outcome, then the project is not applicable: `NOT_APPLICABLE`


**[Back](../_toc.md)**