Fix ci pipeline

Fix ci pipeline #125

Triggered via push October 15, 2024 21:17
Status Failure
Total duration 51s
Artifacts

ci.yml

on: push
Matrix: all tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 2 warnings
all tests (8.2, ^13.4)
Process completed with exit code 2.
all tests (8.2, ^12.4)
The job was canceled because "_8_2__13_4" failed.
all tests (8.2, ^12.4)
The operation was canceled.
all tests (8.3, ^13.4)
The job was canceled because "_8_2__13_4" failed.
all tests (8.3, ^13.4)
The operation was canceled.
all tests (8.1, ^12.4)
The job was canceled because "_8_2__13_4" failed.
all tests (8.1, ^12.4)
The operation was canceled.
all tests (8.3, ^12.4)
The job was canceled because "_8_2__13_4" failed.
all tests (8.3, ^12.4)
The operation was canceled.
all tests (8.2, ^13.4)
The following actions uses node12 which is deprecated and will be forced to run on node16: actions/checkout@v2. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/
all tests (8.2, ^13.4)
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v2. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/