Retry zn_flush_cached_data on ERESTART #2
Annotations
9 errors
Testing (20.04) / zloop
Process completed with exit code 1.
|
Testing (22.04) / functional (part1)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
|
Testing (22.04) / functional (part1)
The operation was canceled.
|
Testing (22.04) / functional (part2)
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 360 minutes.
|
Testing (22.04) / functional (part2)
The operation was canceled.
|
Testing (22.04) / functional (part3)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
|
Testing (22.04) / functional (part3)
The operation was canceled.
|
Testing (22.04) / sanity
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
|
Testing (22.04) / sanity
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
Logs-20.04-functional-part1
Expired
|
797 KB |
|
Logs-20.04-functional-part2
Expired
|
268 Bytes |
|
Logs-20.04-functional-part3
Expired
|
492 KB |
|
Logs-20.04-functional-part4
Expired
|
276 KB |
|
Logs-20.04-sanity
Expired
|
452 KB |
|
Logs-22.04-functional-part4
Expired
|
280 KB |
|
Summary Files
Expired
|
31.4 KB |
|
Zpool-files-20.04
Expired
|
111 MB |
|
Zpool-logs-20.04
Expired
|
51.3 MB |
|
modules-20.04
Expired
|
60.1 MB |
|
modules-22.04
Expired
|
59.8 MB |
|