Skip to content

set new constant value for LogScaler test #2953

set new constant value for LogScaler test

set new constant value for LogScaler test #2953

Triggered via push January 21, 2025 19:50
Status Failure
Total duration 2m 38s
Artifacts

integration.yml

on: push
Matrix: integration
Fit to window
Zoom out
Zoom in

Annotations

25 errors and 1 warning
integration (3.11, ubuntu-latest)
Process completed with exit code 1.
integration (3.9, ubuntu-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (macos-latest, 3.8)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (3.13, windows-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (3.13, windows-latest)
The operation was canceled.
integration (3.8, windows-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (3.8, windows-latest)
The operation was canceled.
integration (3.11, windows-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (3.11, windows-latest)
The operation was canceled.
integration (3.9, windows-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (3.9, windows-latest)
The operation was canceled.
integration (3.12, windows-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (3.12, windows-latest)
The operation was canceled.
integration (3.10, windows-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (3.10, windows-latest)
The operation was canceled.
integration (3.10, ubuntu-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (3.10, ubuntu-latest)
The operation was canceled.
integration (3.12, ubuntu-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (3.12, ubuntu-latest)
The operation was canceled.
integration (macos-latest, 3.13)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (macos-latest, 3.13)
The operation was canceled.
integration (3.13, ubuntu-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (3.13, ubuntu-latest)
The operation was canceled.
integration (3.8, ubuntu-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
integration (3.8, ubuntu-latest)
The operation was canceled.
integration (3.11, ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636