Skip to content

Merge pull request #80 from kif/meson #3

Merge pull request #80 from kif/meson

Merge pull request #80 from kif/meson #3

Triggered via push December 4, 2023 16:59
Status Failure
Total duration 51s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 30.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
Process completed with exit code 30.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
The operation was canceled.