Fork Sync: Update from parent repository #58
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
backend.yml
on: pull_request
Check which files changed
7s
be-linter-cloverage
0s
Matrix: be-check
Matrix: be-tests
be-linter-clj-kondo
1m 39s
be-linter-eastwood
2m 17s
be-tests-java-11-ee-pre-check
0s
Matrix: be-check-stub
Matrix: be-tests-stub
Annotations
10 errors
be-tests-java-21-ee
The operation was canceled.
|
be-tests-java-11-ee
The operation was canceled.
|
be-tests-java-11-oss
The operation was canceled.
|
be-tests-java-21-oss
The operation was canceled.
|
be-tests-java-17-oss
The operation was canceled.
|
be-tests-java-17-ee
The operation was canceled.
|
be-check-java-17
The run was canceled by @zaycev.
|
be-check-java-17
The operation was canceled.
|
be-linter-eastwood
The run was canceled by @zaycev.
|
be-linter-eastwood
The operation was canceled.
|