clean args context for useless. #1257
go.yml
on: pull_request
Test documentation
24s
Lint
17s
Matrix: Build and test
Annotations
7 errors
Build and test (ubuntu-latest, 1.20.x)
Process completed with exit code 2.
|
Build and test (windows-latest, 1.20.x)
The job was canceled because "ubuntu-latest_1_20_x" failed.
|
Build and test (windows-latest, 1.20.x)
The operation was canceled.
|
Build and test (windows-latest, 1.21.x)
The job was canceled because "ubuntu-latest_1_20_x" failed.
|
Build and test (windows-latest, 1.21.x)
The operation was canceled.
|
Build and test (ubuntu-latest, 1.21.x)
The job was canceled because "ubuntu-latest_1_20_x" failed.
|
Build and test (ubuntu-latest, 1.21.x)
The operation was canceled.
|