[PR]: Improving regrid2 performance #1607
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
build_workflow.yml
on: pull_request
skip-duplicate-actions
8s
Matrix: build
pre-commit-hooks
2m 32s
Build Result
0s
Annotations
6 errors and 5 warnings
Build (Python 3.11)
Process completed with exit code 1.
|
Build (Python 3.10)
The job was canceled because "_3_11" failed.
|
Build (Python 3.10)
The operation was canceled.
|
Build (Python 3.9)
The job was canceled because "_3_11" failed.
|
Build (Python 3.9)
The operation was canceled.
|
Build Result
Process completed with exit code 1.
|
Build (Python 3.11)
Mamba support is still experimental and can result in differently solved environments!
|
Build (Python 3.10)
Mamba support is still experimental and can result in differently solved environments!
|
Build (Python 3.9)
Mamba support is still experimental and can result in differently solved environments!
|
pre-commit-hooks
Failed to download action 'https://api.github.com/repos/pre-commit/action/tarball/646c83fcd040023954eafda54b4db0192ce70507'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
pre-commit-hooks
Back off 24.747 seconds before retry.
|